How It Works

From Idea to Bulk Production

Whether you already have a complete Tech Pack or only a reference image, sketch or initial concept, we can help turn your idea into a production-ready jacket. From project review and material planning to sampling, approval, bulk production and delivery, each stage is managed step by step to keep development clear and controllable.

What You Can Start With

You do not need a complete Tech Pack to begin. We can review your project based on the information you currently have.

Tech Pack

Complete measurements, construction details, artwork and material specifications.

Reference Image

A jacket or design image showing the style, silhouette or details you want to develop.

Sketch

A hand sketch or digital drawing is enough to begin discussing the product direction.

Physical Sample

Send an existing garment if you want us to study the fit, construction or details.

Initial Idea

Even if the concept is still early, we can discuss product direction before sampling.

Phase 01

Project Definition

Before sampling begins, we first clarify what you want to make, how it should look and what technical requirements need to be considered.

  1. 01

    Start With Your Idea

    Send us your design, reference image, Tech Pack, sample or initial concept together with the expected quantity and target timeline. The more information we receive at the beginning, the easier it is to understand the product direction and identify key development points.

    Key points

    • Jacket Type
    • Reference or Tech Pack
    • Quantity
    • Main Customization
    • Target Timeline
  2. 02

    Project Review

    Before sampling, we review the jacket type, fit, measurements, materials, construction, artwork, trims and expected order requirements. This helps identify potential technical issues early and creates a clearer direction before the first sample is made.

    Key points

    • Fit & Measurements
    • Fabric & Lining
    • Construction
    • Artwork & Placement
    • Trims & Hardware
    • Quantity & Timeline
  3. 03

    Quote & Development Plan

    Once the project direction is clear, we prepare the sampling and production plan based on selected materials, construction, techniques and quantity. Any details that still need confirmation are listed before sampling so both sides understand what will be developed first.

    Key points

    • Development Direction
    • Material Direction
    • Sampling Plan
    • Cost Review
    • Timeline Planning

What We Review Before Sampling

Review PointWhat is confirmed
FitSilhouette, ease, length, shoulder and sleeve proportions.
MaterialsShell fabric, lining, rib, interlining and supporting materials.
ConstructionCollar, hood, pockets, panels, zipper and internal structure.
ArtworkEmbroidery, print, patches, applique and placement.
TrimsZippers, snaps, buttons, pullers, labels and hardware.
Production RequirementsQuantity, size breakdown, packaging and target schedule.

Phase 02

Product Development

This stage turns the confirmed project direction into a physical sample. Materials, pattern, construction and decoration are coordinated together rather than developed separately.

  1. 04

    Material & Construction Planning

    The right jacket is built from a combination of shell fabric, lining, trims, hardware and construction details. We select materials according to the required appearance, hand feel, weight, season, structure and decoration process.

    Key points

    • Shell Fabric
    • Lining
    • Rib or Interlining
    • Zipper or Buttons
    • Hardware
    • Labels
  2. 05

    Sample Development

    Your first sample is developed according to the confirmed specifications, material direction and construction details. Pattern development, cutting, decoration and sewing are coordinated to turn the design into a physical garment for review.

    Key points

    • Pattern Development
    • Material Preparation
    • Cutting
    • Decoration Testing
    • Sample Sewing
    • Measurement Check
  3. 06

    Sample Review & Revision

    After the first sample is completed, we review the garment from both technical and visual perspectives. Fit, measurements, construction, materials, artwork placement, trims and overall appearance can be adjusted according to confirmed feedback before final approval.

    Key points

    • Fit
    • Measurements
    • Construction
    • Materials
    • Artwork Placement
    • Trims
    • Overall Appearance

What We Check on a Sample

Sample CheckReview content
Fit & SilhouetteCheck whether the jacket achieves the intended oversized, regular, cropped or structured look.
MeasurementsCheck chest, body length, shoulder, sleeve, hem and other key measurement points.
ConstructionReview collar, hood, pockets, panels, lining and seam structure.
Artwork PlacementCheck embroidery, print, patches and other decoration positions and proportions.
Trims & HardwareCheck zippers, snaps, buttons, pullers and custom hardware.
Overall AppearanceEvaluate color balance, proportions, workmanship and garment presentation.

Phase 03

Approval & Pre-Production

Once the sample meets the agreed product requirements, the project moves from development into production preparation.

  1. 07

    Approved Sample

    The approved sample becomes the main reference for bulk production and quality control. Key specifications are confirmed before production begins to reduce variation between the approved sample and bulk garments.

    Locked output

    • Measurements
    • Fabric & Color
    • Construction
    • Artwork Placement
    • Trims & Hardware
    • Labels
    • Packaging
  2. 08

    Pre-Production Preparation

    Before bulk production starts, final order information is organized and checked again. This includes size breakdown, materials, artwork files, labels, packaging requirements and production schedule.

    Locked output

    • Final Specifications
    • Size Breakdown
    • Material Confirmation
    • Artwork Files
    • Label & Packaging Details
    • Production Schedule
Approved Sample = Bulk Standard

The approved sample and final specifications form the reference point for bulk production and later quality inspection.

Phase 04

Production & Delivery

After all production details are confirmed, the order moves into bulk manufacturing, inspection, packing and shipment preparation.

  1. 09

    Bulk Production & Quality Control

    Bulk production follows the approved sample and final specifications as key references. During production, garment construction, workmanship, measurements, decoration and functional details are checked at different stages. Detailed factory operations are explained on the Manufacturing pages.

    Key checks

    • Construction
    • Stitching
    • Measurements
    • Artwork
    • Hardware
    • Final Appearance
  2. 10

    Packing & Delivery

    After final inspection, garments are prepared according to confirmed label and packaging requirements. Order quantity and packing information are checked before shipment, and shipping can be coordinated according to project size and delivery needs.

    Key checks

    • Folding
    • Polybag
    • Size Sticker
    • Hangtag
    • Carton
    • Quantity Check

Process FAQ

Do I need a Tech Pack to start?

No. A Tech Pack is helpful, but we can also begin with a reference image, sketch, physical sample or initial product idea.

Can you develop a jacket from a reference image?

Yes. We can study the silhouette, construction and design direction, then confirm which elements should be changed for your own product.

Can I revise the first sample?

Yes. Sample review and revision are normal parts of custom product development.

Can I change the fabric after seeing the sample?

Yes, but a material change may also affect fit, structure, cost and the next sample.

What happens after the sample is approved?

Final specifications, materials, artwork, size breakdown, labels and packaging are checked before bulk production starts.

Will bulk production follow my approved sample?

The approved sample and final specifications are used as the main reference for bulk production and quality inspection.

Start Your Project

Ready to develop your jacket? Send us your design, reference image or Tech Pack together with your expected quantity and key customization requirements. We will review your project and help determine the next development step.

  • Design or Reference
  • Jacket Type
  • Quantity
  • Main Customization
  • Target Timeline